Office Building in Reno, Nevada

Problem:
For this multi-office two story building, settlements were observed very shortly after its completion. Within two years there was a maximum differential settlement of five inches. It was believed that a wedge of man-made fill, with a maximum depth of thirty feet, was causing the settlements. A number of helical pier foundations had been installed, but settlements continued.

Solution:
A compaction grouting system was successfully employed to densify all of the fill wedge, as well as to lift and level the settled areas.



PIER 45
ROSE BOWL
KOKORO
OFFICE
PLANT
HIGH-RISE

SERVICES
Compaction Grouting
The injection of grout into soil to achieve controlled displacement and densification of the surrounding soil mass and if needed proceed to controlled structural lifting.

Chemical Grouting
The injection of near-water-viscosity liquids into a cohesionless soil to react chemically and create an impervious solid mass, comparable to soft sandstone.

More...