New Mixed-Use High-Rise Building in Downtown
San Francisco

Problem:
For this soon-to-be constructed high-rise office/residential building in downtown San Francisco, the main frame of the building was to be supported on piles, but the soils were determined to be liquefiable to about 35 feet below street level.

Solution:
To abate this problem, soil densification using compaction grouting techniques were employed. The whole site was grouted using a grid of five-foot spacing for the injections.



PIER 45
ROSE BOWL
KOKORO
OFFICE
PLANT
HIGH-RISE

SERVICES
Compaction Grouting
The injection of grout into soil to achieve controlled displacement and densification of the surrounding soil mass and if needed proceed to controlled structural lifting.

Chemical Grouting
The injection of near-water-viscosity liquids into a cohesionless soil to react chemically and create an impervious solid mass, comparable to soft sandstone.

More...